Shine Fm Blog

116st Opens Monday to Traffic!

Posted by Tanya Owen  |  POST A COMMENT
The section of 116 St., from 68 Ave. to 84 Ave, that was closed all summer for paving will be ready for traffic starting Monday.  Traffic signals were installed at the 116 St. and 84 Ave. intersection as part of the improvements.  The upgrades are ongoing, so the area remains a construction zone, with a posted speed limit of 30km/h. Everything should be running normal by mid-November.

Know someone who should know about this?
  • The Shine FM
    Mentor Center

    How can we pray for you?
  • Tell Us Your Story

    What's happening with you?
    Share your story!
  • Get Connected

    Find out how to get more connected with ShineFM.
  • Contact Us

    Didn't catch that number?
    Need our address? Find it here.